优题课 - 聚名师,上好课(www.youtike.com)
  首页 / 试题 / 高中英语 / 试题详细
  • 科目:英语
  • 题型:阅读理解
  • 难度:中等
  • 人气:1201

阅读下列短文,从每题所给的四个选项(A、B、C和D)中选出最佳选项。
(2011年湖北)In today's throwaway society,dealing with the city's growing mountain of waste is an increasing challenge for the city council(市议会).
Recently,Edinburgh is faced with the problem of disposing of(处理) about 250,000 million tons of waste a year. Despite different ways to dispose of much of it in a green manner-largely through encouraging recycling-its aging facilities such as the Powderhall landfill do not have the ability to deal with it.

The European Union (EU) has issued a new policy,regulating how such mountains of waste are to be disposed of. The five councils (Edinburgh,East Lothian,West Lothian,Midlothian and Borders) face fines around £18 million a year from 2013 if they don't increase recycling levels and rely less on landfill. With this in mind,the councils got together with the idea of building a large incinerator plant(垃圾焚烧厂) to burn half of the waste produced in their districts. But this plan fell apart after the change of target levels by a new UK government waste policy which required that no more than 25% of the city's waste should be disposed of in this way by 2025.
After the plan was abandoned,a private company which already transported millions of tons of the city's waste by train to a landfill site near Dunbar,offered an alternative solution when it suggested opening a huge waste site near Portobello.
Since Powderhall is supposed to close in 2015,it seemed necessary for the members of the Edinburgh Council to accept the suggestion. But soon they turned it down-after 700 local objections reached them-because it would have meant hundreds of lorries a day making loud noise through heavily populated areas.
That still leaves the council with a problem. By 2013,only 50% of 1995 levels of waste will be allowed to be sent to landfill. Even if recycling targets are met,there will still be a large amount of rubbish to be burnt up. Due to this,Edinburgh and Midlothian councils have now decided to work together to build an incinerator plant as time to find a solution is fast running out.
The main way of handling waste in a green manner in Edinburgh is ________.

A.recycling
B.restoring
C.burying
D.burning

The five councils worked out a plan to build an incinerator plant to ________.

A.reduce the cost of burying waste
B.meet the EU requirements
C.speed up waste recycling
D.replace landfill sites

The city council of Edinburgh rejected the suggestion to open a huge landfill site near Portobello because ________.

A.it came from a private company
B.the council was not interested in it
C.it was not supported by EU
D.the local people were against it

What is the final decision of Edinburgh and Midlothian councils?

A.To open a new landfill nearby.
B.To close the Powderhall landfill in 2015.
C.To set up a plant for burning waste.
D.To persuade people to reduce their waste.
登录免费查看答案和解析

阅读下列短文,从每题所给的四个选项(A、B、C和D)中选出最